Projects
ABOUT US
Services
INFRASTRUCTURE
Non-Infrastructure
Domestic Solutions
TOPOGRAPHICAL SURVEYS
Attenuation Services
NEWS
CONTACT US
Contact Us
Projects
ABOUT US
SERVICES
Infrastructure
Non-infrastructure
Domestic Solutions
Topographical Surveys
Attenuation Services
NEWS
CONTACT US
Contact Us
Projects
Rowallan Castle, Bridge Works. Kilmaurs
Project Details
Callidus Construction Scotland worked over a 3-week period preparing for a new bridge installation
First part of the project was installing 3m diameter pipe which took careful planning and design work to ensure the pipe was safely positioned.
Over pumping of the river while the team got to work installing concrete bases to adopt the shuttering system.
Each end of the pipe has a cladding system fixed onto the concrete encasements.
Phase 2. Preparation for the bridge deck works.
Service
Concrete Solutions
Client
Rowallan Castle
No items found.